The Al Habtoor City Towers are 3 high-rise buildings in Dubai which are simultaneously being realized, eventually reaching heights of around up to 300 m.
- Two high-rise buildings with a height of 307 meters and 75 floors each
- One high-rise building with a height of 213 meters and 52 floors
- 1,500 new, exclusive apartments
Al Habtoor Leighton Group (HLG), Dubai
Location
Main Application
Torres e Arranha-céus
O Projeto
Impressões do processo do projeto
The Al Habtoor City Towers are three high-rise buildings which are growing up to a height of 300 meters at the same time.
The modular-type ACS self-climbing technology ensures high productivity and short cycle times.
The PERI climbing formwork solution is based on different ACS versions which are individually adjusted to the project requirements. The centerpieces are the climbing hydraulics with the ACS climbing system.
The two 307 m high-rise structures each have 75 floors while the third building reaches a height of 213 m and has 52 floors.
The core and supporting walls are climbed in advance and crane-independently with ACS and VARIO. For each high-rise core, two placing booms are carried with the help of the ACS Self-Climbing System.
Slab tables with the integrated Table Swivel Head and PEP Ergo Slab Props are an integral part of the comprehensive PERI complete solution.
The Al Habtoor City Towers are three high-rise buildings which are growing up to a height of 300 meters at the same time.
The modular-type ACS self-climbing technology ensures high productivity and short cycle times.
The PERI climbing formwork solution is based on different ACS versions which are individually adjusted to the project requirements. The centerpieces are the climbing hydraulics with the ACS climbing system.
The two 307 m high-rise structures each have 75 floors while the third building reaches a height of 213 m and has 52 floors.
The core and supporting walls are climbed in advance and crane-independently with ACS and VARIO. For each high-rise core, two placing booms are carried with the help of the ACS Self-Climbing System.
Slab tables with the integrated Table Swivel Head and PEP Ergo Slab Props are an integral part of the comprehensive PERI complete solution.
Informações do Projeto
Hayder Awni
Project Manager
PERI´s ACS system has once again proved its uniqueness. We can safely and quickly realize our very complicated core wall as well as in a very high quality with the ACS without having to utilize the crane. This is a big advantage on our construction site.