Sewage plant As Samra, Jordan - With the selected PERI formwork and scaffolding systems, the construction team was able to cost-effectively fulfil all requirements in spite of the tight construction schedule. The solutions developed by PERI engineers and the local site management, along with support provided by PERI specialists, contributed to efficient and problem-free construction.

Instalações de esgoto As Samra, na Jordânia
Samra, Jordânia

Usina de esgoto de grande porte com cerca de 60 edifícios individuais

Período de construção: 2004 – 2006



Customer: Morganti Group, Inc., USA

Location
Main Application
Projetos Internacionais

O Projeto

Impressões do processo do projeto

Informações do Projeto

Ghassan A. Kawash, Project manager, Statement Samra
Ghassan A. Kawash, Project manager, Statement Samra
Ghassan A. Kawash
Project manager
A PERI conseguiu nos oferecer soluções abrangentes e viáveis. Os sistemas de forma e andaimes aplicados foram muito versáteis e fáceis de instalar. Além disso, a colaboração cooperativa com a PERI foi consistentemente positiva.

Produtos Relacionados

Você está trabalhando em um projeto como este?

Ligue para nós no +55 (11) 4158 8188 para discutir mais sobre suas necessidades.
Contate-nos
Sewage plant As Samra, Jordan - With the selected PERI formwork and scaffolding systems, the construction team was able to cost-effectively fulfil all requirements in spite of the tight construction schedule. The solutions developed by PERI engineers and the local site management, along with support provided by PERI specialists, contributed to efficient and problem-free construction.
Sewage plant As Samra, Jordan - With the selected PERI formwork and scaffolding systems, the construction team was able to cost-effectively fulfil all requirements in spite of the tight construction schedule. The solutions developed by PERI engineers and the local site management, along with support provided by PERI specialists, contributed to efficient and problem-free construction.