O Projeto
Impressões do processo do projeto
Informações do Projeto
Martín Bredda
Site Manager
In particular, the upper part of the tower with its distinctive geometry and the varying inclinations as well as the load transfer to different assembly levels presented substantial challenges. The PERI solution adapted itself perfectly to suit the given requirements and allowed us to optimize the work performance. I would like to especially highlight the engineering performance of PERI – through their support and the constant exchange of ideas with our site management, we could work out the best solution.